Seek truth, innovate, forge ahead, unite and strive, dare to be the first.
Category:
Keywords:
Wind Turbine Installation
Details
Mainstream domestic wind turbine installation methods are divided into single-blade split installation and integral impeller assembly installation. After years of construction experience accumulation, the company has successfully mastered the core installation technology. Its construction performance covers many well-known equipment models, such as Shanghai Electric, Mingyang, Goldwind, Envision, Haizhuang, etc. The maximum wind turbine model that can be installed is 10MW, the maximum blade length is 102m, the normal construction efficiency can reach 1 unit every 3 days, and the fastest record is completing the installation of 15 sets of wind turbines in 30 days.

Seek truth, innovate, forge ahead, unite and strive, and dare to be the first.
Contact Us
Address:Rooms 103 and 203, Building B1, No. 111 Gensi West Road, Industrial Park, Taixing City
Follow Us
Copyright © Jiangsu Risheng Marine Equipment Co., Ltd